Thursday, November 28, 2019
William Wordsworth Essay Example
William Wordsworth Paper William Wordsworth was born in Cumberland. Wordsworth entered Cambridge University in 1787, the year he completed his first significant poem. Wordsworth is considered to be the most important English romantic poet. Wordsworth has also been praised for his descriptions of nature. But he traditionally claimed that his primary interest was The Mind Of Man. His finest poems include Michael, the Lucy lyrics, The Solitary Reaper, and Resolution and Independence, dramatize how imagination creates spiritual values out of memory of sights and sounds of nature. Seamus Heaney is an Irish Poet, educated at St. Columb`s College, Derry, and Queens University Belfast. In the 1960`s he belonged to a group of poets in Belfast, who, he said, Used to talk poetry day after day with an intensity and prejudice that cannot but have left a mark on all of us. After lecturing on poetry at Queens for six years he moved in to the Republic Of Ireland, living first in Co. Wicklow and then in Dublin. The first poem which we looked at was William Wordsworth`s Nutting. The title of this poem is extremely vague and it does not tell us nothing about the poem itself. As I begin to read the poem we see that it is reflecting on a memory, It seems a day. It is a memory of his childhood days and this thought holds an eternal place in his heart and mind. We will write a custom essay sample on William Wordsworth specifically for you for only $16.38 $13.9/page Order now We will write a custom essay sample on William Wordsworth specifically for you FOR ONLY $16.38 $13.9/page Hire Writer We will write a custom essay sample on William Wordsworth specifically for you FOR ONLY $16.38 $13.9/page Hire Writer Reading on we feel that the mood is going to change and he starts to examine his appearance. He is proud of the way he is dressed and what he is doing. He is reminiscing his childhood of when he goes out and collects nuts and discovers that he annihilates the whole vicinity. He is saddened that he has destroyed Dearest Maiden (mother nature) and he leaves the scene distraught and doesnt want the sky to intrude on what he has done. The second poem which we looked at was Blackberry Picking by Seamus Heany. The title proposes to us that it is Summer time and he is setting off on an adventure in late August. It begins with, Late August, given heavy rain and Sun, which is essential for blackberry growth. The blackberries would ripen which suggests new life and great trepidation because he is taking his time. The blackberries are as Hard as a knot. This is used as a simile so that we know that we are implicated. Throughout the poem various senses are used creating a real-life feeling and experience, Until the tinkling bottom has been covered, The juice was stinking too. We see the different stages blackberries go through. We are told of them once they are in their prime, when they are nice and ripe, For a full week the blackberries would ripen. We are told how fine the blackberries are but once we reach the closing stages we get a feeling that something dire is going to happen. Everything seemed to be going wrong when they said, The juice was stinking too and The sweet flesh would turn sour. This is when the blackberries are destroyed by the fungus because they are of the byre. In conclusion both of these poems are of recollection of the authors childhood memories. Wordsworth describes his poetry as Emotion recollected in tranquillity as an older man he recollects his journey as a young boy. Seamus Heany on the other hand has a different outlook of his life now than when he was as a child. He was disappointed and his human emotions really personalises the poem towards the readers. In my opinion I feel that Seamus Heanys Blackberry Picking was much more convincing than William Wordsworths Nutting because Seamus Heany uses different senses which makes the poem seem more real-life and much more pleasant to recite.
Sunday, November 24, 2019
Quotes to Help You Say I Love You
Quotes to Help You Say 'I Love You' You can be romantic when you profess your love, you can be poetic, and you can be cute. But what is the best way to do what should be the easiest thing: to express your love simply and directly, other than most basic approach: I love you? Here are some quotes attempting to find that simplicity. Its difficult to be sure who wrote some of them, but the thought is whats important, not the pedigree. Its always best to put your declaration of love in your own words, but maybe one of these will work for you, or maybe they will inspire you to come up with your own combination of words. As Plato probably said, ââ¬Å"At the touch of love everyone becomes a poet.â⬠Leo Christopher, The Wisest Man on Instagram ââ¬Å"I swear I couldnââ¬â¢t love you more than I do right now, and yet I know I will tomorrow.â⬠Roy Croft, American poet (possibly a pseudonym) ââ¬Å"I love you not only for what you are, but for what I am when I am with you.â⬠Emily Bronte, English novelist and poet ââ¬Å"If raindrops were kisses, Iââ¬â¢d send you showers. If hugs were seas, Iââ¬â¢d send you oceans. And if love was a person Iââ¬â¢d send you me.â⬠Atticus, Greek or Roman philosopher I will never be perfect for you, but I will always imperfectly try to be.â⬠R.M. Drake (Robert Macias), self-published poet ââ¬Å"It was the way you laughed; I knew I wanted that in my life.â⬠Anais Nin, French author You carry away with you a reflection of me, a part of me. I dreamed you; I wished for your existence. You will always be a part of my life. If I love you, it must be because we shared, at some moment, the same imaginings, the same madness, the same stage. Franz Kafka, Austro-Hungarian writer ââ¬Å"I know of no greater happiness than to be with you all the time, without interruption, without end.â⬠A.A. Milne, British author, created Winnie-the-Pooh ââ¬Å"If you live to be a hundred, I want to live to be a hundred minus one day so I never have to live without you.â⬠J.R.R. Tolkien, British author ââ¬Å"I would rather spend one lifetime with you, than face all the ages of this world alone.â⬠Charlotte Brontà «, English novelist, Jane Eyre I have for the first time found what I can truly love- I have found you. You are my sympathy- my better self- my good angel- I am bound to you with a strong attachment. I think you good, gifted, lovely: a fervent, a solemn passion is conceived in my heart; it leans to you, draws you to my centre and spring of life, wrap my existence about you- and, kindling in pure, powerful flame, fusesà you and meà in one. Honore de Balzac, French novelist and playwright ââ¬Å"Tonight I can only say that I love you too well for my peace of mind, and that absence from you is death to me.â⬠Hermann Hesse, German novelist and poet f I know what love is, it is because of you.â⬠Angelita Lim, probably a poet I saw that you were perfect, and so I loved you. Then I saw that you were not perfect and I loved you even more.à Nicholas Sparks, American romance novelist and screenwriter You are the answer to every prayer Iââ¬â¢ve offered.à You are a song, a dream, a whisper, and I donââ¬â¢t know how I could have lived without you for as long as I have. Anonymous When I follow my heart, it leads me to you.
Thursday, November 21, 2019
PROGRAMMING AND CULTURE IN ARCHITECTURE WAY Assignment
PROGRAMMING AND CULTURE IN ARCHITECTURE WAY - Assignment Example On a further note, the other major functionalities of the site include possessing a small grocery store in the restaurant wherein the customers can find traditional Guatemalan foods and setting the environment of the place with beautiful paintings and marimba music. Considering the major functions that have been previously discussed, the element concerning the level of competition prevalent within the site is likely to be less important for Guatemalteca Bakery Restaurant. This can be judged based on the fact that the business of the restaurant focuses on providing superior quality of products and/or services related to various menus of foods as well as other add-on facilities to the customers that enabled towards sustaining its operations efficiently (Pearson South Africa 78). In addition, the element concerning the pricing of the competitors is deemed to be less important for the restaurant. Justifiably, it can be affirmed that the business deals with various services that include sprawling space food, bakery section and grocery store as well as dining area that are likely to grow the attractiveness of the site, without imposing much level of impact on the pricing decisions of the
Wednesday, November 20, 2019
Business planing Assignment Example | Topics and Well Written Essays - 1500 words - 1
Business planing - Assignment Example Our products will be of high quality and our services will be exceptional (Tuver, 2009). Zaet mobile home accessory and gift shop aim at creating a personalized home environment. Our services and products will be located in the City of San Diego as we look forward to extending it to the other parts of the state (CANN, 2012). Our stores will be in various part of the city, and we shall have a twenty-four hours customer service in place. The city of San Diego will be our target market. As per the population study that was conducted in the year 2014, the cityââ¬â¢s population was estimated at 3,368,650 people with 58.9% being white, 45.1 % non-Hispanic, 6.7 % black and African-American. 28.8% Latino whereas the Asian population was represented by 15.9 %. The San Diegoââ¬â¢s urban area has a total population of 3,095,313 making it the third largest city in the state of California (Simons, 2011). The high population will provide a ready market for our products. Our business will target more middle-class and upper-class consumers who focus beyond the national gift chain stores as well as home accessory for that expression of style and individual personality. I believe that our unique products, quality, and unparallel customer service, as well as values, will complement the experience of our clients. Through our online services, we expect to target more and more customers in the city as well as other parts of Calif ornia. The firm expects to register comfortable total revenue at the end of the first year, Followed by the development of marketing plans in the second year as well as creation of E-commerce and extension of our business to other parts of the city by the end of the third year (Sarr, 2009). The 2013 census report indicated that there was an increase in the number of household. San Diego has over a million families according to the survey that was conducted in the year 2013. The city has recorded a poverty level of below ten percent as well as median
Monday, November 18, 2019
Infection control in the hospital Essay Example | Topics and Well Written Essays - 1000 words
Infection control in the hospital - Essay Example In this regard, the nursing professionalism as designated by Nursing and Midwifery Council (NMC) codes of conduct will be referred to with reference to the theoretical underpinning of adult nursing care delivery. The objective of this assignment would thus be recognition of the parameters of healthcare environment and the factors associated with it, which may influence safe healthcare delivery by the nurses to the intended population. The National Health Service (NHS) was expected to provide universal healthcare of identical standards throughout the UK. It was supposed to be comprehensive such that it would cover all health needs of the population. The third principle was to make it free at the point of delivery, so that it is available based on needs to all citizens equally, not on the ability to pay. The system works through a participatory structure involving conjoint work of the Local Health Board and Local Health Authority including Community Health Council and other private or voluntary organisations (Goldie and Sheffield, 2001). Since the NHS activities are sum total of national and local policies, it would be worthwhile to examine which policies may influence the health and social care in adult nursing (Department of Health, 2003). These include Misuse of drugs (Act 1971); infection control, food hygiene, health and safety work (Act 1974); moving, handling, and protection of vulnerable adult and public health disease control (Act 1984); disability discrimination act (Act 1995); data protection act (Act 1998); and over all, the policies in relation to standards of care (Hewitt-Taylor, 2003). The National Institute of Clinical Excellence (NICE) is a vehicle of production and dissemination of evidence-based practice guidelines in order to influence the practice of the healthcare professionals including nurses. NICE provides technical and operational criteria of treatment practices and guidelines for promotion of
Friday, November 15, 2019
Timber Frame Construction Trends in Irelands Housing
Timber Frame Construction Trends in Irelands Housing Introduction Modern construction comes in many forms, from traditional masonry, to precast concrete, to steel, and in recent times timber frame construction. Timber frame and masonry construction are very similar looking buildings. Over the last thirty years in Ireland the main type used in domestic dwelling was masonry construction which consists of block inner leaf, cavity, insulation and a block outer leaf, externally finished normally with a brick or plaster rendered block. Over the last twelve years timber frame construction has grown to account for nearly forty percent of the market. Timber frame construction consists of an off site engineered building which arrives to site and the pieces are assembled to complete the unit. The external finish is similarly to masonry with brick or plaster rendered block. The reason for chosen this topic is to find why this change occurred. The purpose of this dissertation is to examine the Irish housing market over the last number of years, also to find out the reasons for timber frame construction becoming more popular. Aim To find out why the trend of building domestic housing in Ireland has changed from masonry construction to timber frame construction. Objectives To investigate the Irish housing market and find reasons for the trend change from masonry construction to timber frame construction. To examine the reasons why timber frame construction has grown to the level it has over masonry construction. To examine the views of homeowners and property developers towards timber frame construction. Literature Review The primary data will be sourced from RGU database, Internet sites, RGU books and journals. Relevant Irish government reports and websites will also be looked at to gain an unbiased view. Also the views of the construction agencies in Ireland will be explored. Research and methodology The author plans on doing a comparison of the two construction types in order to achieve reasons for the shift in trend. The brief comparison case studies will include cost, time, heat and energy of both types of construction. Questionnaires Questionnaires provided the primary research for this dissertation. The author shall do up one and give it out to relevant homeowners and property developers to gain an insight into their views. By doing this the author will find out the market potential of timber frame construction. Structure of Dissertation Chapter One This chapter explains the title of the dissertation, introduces the motivations and gives a background for the reasons for choosing this topic. The author explains to the reader the aim and objectives of the dissertation and how they are going to be achieved. Chapter Two The literature review will investigate in trend in Irish construction. Current construction agencies reports will be looked to try and gain an insight to the change in trend. The author feels that this will achieve the first objection of this dissertation. Chapter Three This chapter will investigate the two building options with regard to cost, time, heat and energy. This will be done by a number of interviews and case studies. Areas looked at will be construction cost and life cycle costs. Also will include a case study of both types of construction where U-Values and Building Energy Rating will be achieved and assessed to gain an insight into why the trend shifted. The author feels that this will achieve the second objection of this dissertation. Chapter Four This chapter the opinions and views of homeowners and property developers towards timber frame construction and masonry construction are explored by means of a questionnaire. The author feels this will achieve the third objection of the dissertation. Chapter Five In this finally chapter the conclusion provides a brief summary of the finding of the preceding chapters. Literature Review Background Over 70% of home in the developed world are timber frame homes. 60% of Scottish new dwelling are timber frame and over all in the United Kingdom timber frame accounts for 15% of new homes. Ireland is slowly following our neighbours. Over the last ten year Ireland had been experiencing a construction boom. Housing units been completed in 2000 being 49,812 units growing to 62,686 in 2003, peaking in 2006 with 82,980 unit completed. After 2006 the housing market in Ireland started to fall, numbers of units being built in 2007 being 71,356 continuing to fall in 2008 as 48,151 units and continuing to fall in 2009. (Central Statistics Office Ireland 2008) Many housing estates and apartment blocks had been popping up in every city, town and village mainly around the computer belt around the capital city of Ireland Dublin. Then slowly the rest of the country following. In 1992 timber frame construction account for only 5% of the new dwelling market. Since then it has grown to enormous levels to account for 30% of total housing construction nationally (Construction Industry Federation 2009). Typical these building were constructed by masonry construction, this consisted of a 300mm cavity wall with block inner leaf, insulation, cavity and a brick/block outer leaf finished with a plaster render. Over the last seventeen years timber frame construction has shown steady growth. Timber frame construction consists of an off site engineered building which arrives to site and the pieces are assembled to complete the unit. The external finish is similarly to masonry with brick or plaster rendered block. Some industry experts predict that by 2012 it will account for 50% of the new dwelling market. The timber frame industry in Ireland has shown strength and resilience, despite these difficult economic times. When the upturn comes, timber frame construction will be presented with numerous opportunities. (Maurice Buckley, CEO, NSAI National Standards Authority of Ireland.) Reasons for this happening? Energy In Ireland over the last number of years there has been a turn in attitude regarding the environment, which has in some part resulted in changes been implemented by the construction industry with regard to energy conservation. The main topic that has come to the fore on an Irish domestic level is the conservation of fuel and energy consumption. The construction industry has been identified as a considerable part of the national energy bill. Attitudes of developers and homeowner are changing to environmentally friendly buildings. Due to this timber frame construction has seen a steady growth. Timber frame is renewable building option, for every tree cut down two more are planted. The cost of turning the raw product into a building material is conceivably less than traditional methods. Timber is the only sustainable renewable commercially viable building material. The production of concrete produces vast amounts of Carbon Dioxide (C02), which has a negative impact on the environment and contributes significantly to global warming. (Irish Timber Frame Manufacturing Association 2009) Speed As the construction boom grow so did the need for housing and more importantly fast housing. One of the main factors for this turn towards timber frame is speed of construction. The frame of the building can be erected in a number of days which compared to typical masonry building is incredibly faster. This is due to the timber frame been constructed off site in a factory and delivered to site as a planned process of assembly. Masonry on the other hand takes a number of weeks to reach roof level where as timber frame is erected in a number of days. Even in wet weather work can still continue as a scaffolding system is in place around the foundation, where as blocks for masonry construction can only be laid in dry weather. Also with timber frame construction the building is weather proof much faster so internal works can begin much quicker. Also a lot of the slower work for plumbers and electricians such as first fixing is much easily done in a timber frame house. Timber frame has 30% shorter, more predictable construction time than brick and block (UK Timber Frame Association 2009). In masonry construction the use of wet trades in the build causes extra time needed for drying out. Because timber frame is a dry form of construction there is no drying out time which is a saving of a number of weeks. Also because of this there is less lightly a risk of cracking appearing on walls and ceilings for shrinking which can occur in masonry frequently. Cost The cost of a timber frame house is similar to masonry built. Unlike masonry, costs of a timber frame build can be fixed long before the foundations are poured. This is due to most timber frame suppliers also fix the structure. So a fix price for a fixed solution. No rain days for wet trades or no additional costs. This ensures that the additional expenses that spiral as a building progress can be eliminated. (Irish Timber Frame Manufacturing Association 2009). The number of persons need to fix the structure is lower than a masonry build, also with regard to time, time is money so the faster the build the cheaper for the developer and homebuilder. Also the hand over time for a complete dwelling is must faster so this will benefit developers cash flow and profitability. Due to the speed of construction on site security cost or greatly reduced. Flexibility of Layout Because timber frames internal walls being construction out of light weigh partition walls the internal space of a timber frame build is very flexible. Any mistakes in layout of internal walls is easily rectified, where as masonry internal wall would be particularly more difficult to correct. Case Studies Introduction To get real reasons for the trend mover towards timber frame construction and to get a true indication of the cost difference in both timber frame and traditional masonry domestic construction the author looked at two key areas, construction costs and life cycle costs. In relation to construction costs the areas of preliminary costs; plant and equipment costs and site labour costs are looked at in greater detail. Construction Costs Preliminary Costs Every construction project incurs preliminary costs. Preliminary costs are defined as, Costs which are directly involved with the overall completion of a construction project ( Roy Chudley 2002) These costs include items such as site management, insurance for the project, drivers and operatives. On larger sites where site cabins, offices, storerooms, toilets and canteens are required the costs incurred are also referred to as preliminary costs. For each project there is an allowance set aside for preliminary costs. However in relation to timber frame construction these costs are included in the overall timber frame package. This is a result of the majority of the work required for timber frame construction being carried out off site, which in turn makes the budget costs a lot cheaper than traditional masonry. Derek Moore a director with Timberline building contractors Ltd Dublin states, by pre-manufacturing the timber frame off-site, houses are constructed more cost effectively. (Pick a Pro 2009) To back up this point the Irish Timber frame manufactures association states this method of construction is not cheaper particularly if the builder hasnt thought his practices through but because factory fabrication means much greater predictability, better controls and of course, a faster pace (Irish Timber Frame Manufacturing Association 2009). This is not the case for its traditional masonry counterpart as preliminary costs are required as a separate budget, this is due to the fact that all of the work required for traditional masonry is carried out on site. A majority of the preliminary budget for the traditional masonry method includes hire of plant and provision for skips and concrete silos on site etc. Another factor to be taken into consideration is the time period taken to construct a timber frame house, which is significantly lower than that of traditional masonry counterpart. Costs such as site supervision and the need for engineers and the like on site are greatly reduced. Plant and Equipment Costs Plant and equipment costs should be taken in to consideration when dealing with construction costs. Every project requires certain types of equipment and plant to carry out work to a conclusion. According to Colm Kilroy a quantity surveyor with Michael Higgins and associates in Galway, plant and equipment costs are a major part of all construction projects, the utilization of such equipment is vital as a lot of money can be wasted due to bad management and planning on site. He continued to say if plant is required on site for a certain job it is vital that the site is ready for that equipment as once it arrives on site it has to be paid for. (Colm Kilroy 2009) The weather can also plays a part in plant and equipment costs, adverse weather conditions can lead to a lot of equipment being left idle while the cost for having it on the site is still being charged. Obviously the weather conditions cannot be controlled by the project team but in periods of forecasted inclement weather the ordering of plant and materials should be avoided if possible. Site Labour Costs This area of site labour costs greatly differs with both methods of construction. A lot of the factors in relation to cost for the timber frame method of construction are all inclusive of the over timber frame package, the majority of the work to be carried out by specialised labour is completed in the factory and once the timber frame unit leaves for the site their work is finished. This in turn reduces any call back costs, to complement this, the Irish timber frame manufactures association states that, There are lower call back costs; any problems encountered can be eliminated immediately by the timber frame specialists before leaving the factory. (Irish Timber Frame Manufacturing Association 2009) The cost for the labour to rectify these problems is still inclusive of the timber frame package. Traditional masonry construction is in comparison carried out differently with all the construction work associated with traditional masonry been carried out on site and with each individual trade requiring labour to carry out the work. Cost Case Study The author compiled a cost comparison from a construction contractors point of view for the development of a timber frame and masonry domestic dwelling. The house plans used to carry out this comparison were based on a single house within a development of five similar houses, only the major elements of the structures were included in the pricing. for the comparison were obtained from Barry Doyle a quantity surveyor with a Co Carlow company and John O Connell a construction contractor in Co Galway. The timber frame house is more expensive to construct than its masonry counterpart. There is a cost difference of approximately à ¢Ã¢â¬Å¡Ã ¬9,000 between both methods to construct a single house taking the main structural elements in to consideration. For the development consisting of five houses where this house is located the total price difference in the construction of the five houses using both methods of construction can be up to à ¢Ã¢â¬Å¡Ã ¬45,000 to à ¢Ã¢â¬Å¡Ã ¬50,000. The following information shows the reasoning behind the price differences for the important elements of the construction. Timber frame kit This element looks to be very expensive but the majority of materials needed to complete the timber frame house including the labour needed for the construction are included. Concrete raft foundation The price of the raft foundation differs as there is less steel required in the raft for the timber frame house in comparison to the masonry built house, this leads to savings for both the labour and materials. Block work The difference in the price of the block work is due to the inner leaf and the internal walls of the timber frame house been constructed of timber. Roof The timber frame kit incorporates a majority of the roof in the over all package which leads is a massive price difference from the standard roof for the masonry dwelling. Insulation Due to the requirement for more insulation in the timber frame house there is a difference in price over its masonry counterpart. Slabbing As with the insulation due to the amount of timber stud internal partitions and timber inner leaf walls the timber frame dwelling requires more plaster board than the masonry method which increases both the amount of material and labour. Plastering The plastering element differs solely because of the reduced quantity of scratch coat required in the timber frame house. Carpentry The price difference in relation to carpentry is a result of a lot of the timber work coming pre fabricated as part of the timber frame kit, an example being the doors coming pre hung with ironmongery fitted and architrave already attached. Main contractors Profit The main contractors profit has been calculated on the standard percentage being 5%. Life Cycle Costs Introduction Life cycle costs are commonly interpreted as,The operating costs of buildings over the forecast useful life attributed to them (Bruceshaw 2009) These costs include initial capital costs, occupation costs and operating costs. In relation to the building industry and in particular to the traditional masonry and timber frame methods of construction, life cycle costs are essential in deciding which is the overall cost effective method of construction is. In this chapter the author discusses areas such as the running costs and other costs that are involved with both forms of construction. Design Differences and Alterations From an aesthetic point of view timber frame and traditional masonry constructed dwellings when constructed look very similar, however timber frame houses, Allow for more versatile designs than block built houses (Pick a Pro 2009) The question is once the house is constructed how easy is it to carry out modifications to the design. In relation to these alterations Kingspan Century state, Due to the fact the inner leaf of your timber frame house is constructed of solid wood and plasterboard, and not concrete blocks and plaster, extensions and alterations generally have significantly reduced impact on the existing building. (Kingspan Century 2007) To further this statement MBS Timber frame Ltd state, Because the interior of a timber frame house is made of wooden panels and plasterboard, alterations and extensions will not involve the mess and severe disruption of knocking down solid block walls, and all the other trials and tribulations that accompany this type of work. (MBC Timber Frame 2009) Alternatively the block work internal leaf of a masonry house has distinct advantages over is timber frame counterpart. Tasks such as fixing a shelf or curtain rail can be a tricky with the timber frame method, There is no problem doing this in a masonry build home as all the walls are capable of holding shelves, curtain rails etc. it would be a simple matter of drilling the holes in the correct place and screwing your shelf into place (Irish Concrete Federation 2009). In comparison, with a timber frame house, according to John Meehan a carpenter with a Co Galway Company, If you are installing a new kitchen or television unit, you may find that there are no grounds in the wall where you need a fixing. If in this situation if your fixing is put in place without finding a stud, the unit is sure to fall down under pressure. (David Treacy 2009) Property Market and Selling Value Influencing factors in relation to domestic construction include resale value and ease of sale. The traditional masonry constructed process has built up a reputation of been a good seller and a favourite with the Irish public, Galway auctioneer John Gilmore states, Block built houses are easier to sell as people generally go for the trusted method, a lot of people inquiring about timber frame houses are wary and are not easily convinced as to its benefits (Liam Gordon 2009). The view of an Irish timber frame company is that, Auctioneers and estate agents are generally of the opinion that not only is timber frame not an obstacle in selling a home, but on the contrary, is becoming more and more a major selling point. The energy efficiency of timber frame houses is becoming an increasingly valued characteristic. (Kingspan Century 2008) To reiterate this, For mortgage purposes and insurance, most lenders and insurers rank timber frame equally with block work. As far as resale value is concerned, there appears to be no difference at all between the two systems. However some individuals have their own preferences, built up from their own experience or things they have heard about either system. (Homebuilding and Renovating Magazine 2005) Running Costs The timber frame method of domestic construction encounters large savings over its traditional masonry counterpart. These savings result from the timber frame house having an allowance for insulation on both the external and internal walls; this differs considerably from the traditional masonry method where in most cases only the external walls contain insulation. Because timber frame structures are extremely well insulated and have less mass than more traditional forms of construction, significant savings can be made in heating costs. (Homebuilding and Renovating Magazine 2005) A leading Irish timber frame company states, Savings of between 30% and 40% on heating bills are fairly typical. (Devsan Timber Frame Homes 2009) In relation to further savings in the future with timber frame, It is estimated that the heating cost of a timber frame home can be 30% lower than that of a masonry dwelling, and the rapid rise in energy costs these costs look set to increase. Sunday Business Post Newspaper 2007) In conclusion the savings to be made with the timber frame method of domestic construction in relation to heating and energy use are extensive over its masonry counterpart. Time of Construction Introduction From a time to construct perspective the length of time it takes to build and finish both forms of construction differs. The construction of a traditional masonry dwelling has a longer time programme than its timber frame counterpart. The main factors contributing to the difference in construction times include. Programme of works The programme of works for both methods has a time difference of approximately seven weeks from foundation stage to decorating and moving in stage. Derek Moore of Timberline building contractors states, In terms of build speed, timber frame can deliver a significant 30% reduction on traditional construction times, which affect cash flow and reduces local disturbance. (Pick a Pro 2009) The view of another Irish timber frame supplier is the construction time of both methods of construction is even larger depending on the building, Construction time is cut by almost 40% as your timber frame structure is erected on site within days depending on size and complexity of building. (Clark Group 2008) Building Finishes During the stage whereby the timber frame unit is erected the internal first fixing work can commence. This work can proceed inside the house as the masonry skin is being built, in comparison no internal work can commence on the masonry house while the block work element is being constructed. The long drying out period associated with traditional masonry construction is also a disadvantage in comparison to the timber frame method. Apart from the obvious labour saving, timber frame doesnt need any drying-out time, unlike a standard masonry construction, which needs up to 1,500 gallons of water to evaporate before it is dry. (Sunday Tribune 2001) To reiterate this a leading Irish timber frame supplier states, Timber frame aids internal finishes, all walls are straight and plumb, corners are square and true. With timber frame there are less of the wet trades, plasterboard needs only to be skimmed and paint, decorative materials and floor coverings can be applied sooner to dried surfaces. (Castle Timber Frame Homes 2009) Heat Loss in Buildings Introduction For the purpose of this dissertation the author compared the U Value of the external walls of both a timber frame and masonry constructed dwelling, the author also decided to obtain the Building Energy Rating (BER) for both methods of construction so as to make an accurate comparison. Both the U Value calculation and the Building Energy Rating are based on the house plans. With the expertise of Michael Sweeney of Sweeney Energy the U Value and BER calculations were compiled and the results are as follows. U-Value Calculation A U-value is the term given to the measure of heat loss through sections of a building. It measures the rate that heat transmits through a component or structure when there is a difference in air temperature at both sides. U Values are expressed in Watts per metre Kelvin which is the rate of heat transfer in watts through 1m2 of the structure for one unit of temperature difference between the air on the two sides of the structure. (Roy Chudley 2002) U-Value Terms The following are terms associated with the calculation of the U-Value. Thermal Conductivity It is the measure of a materials ability to transmit heat and is expressed as the energy flow in watts per square metre of surface area. (Roy Chudley 2002) Thermal Resistance This is symbolized by the letter R, as representative of a materials thermal resistance achieved by dividing its thickness in metres by its thermal conductivity. (Roy Chudley 2002) Timber Frame U-Value Calculation The above calculations show that a traditional masonry external cavity wall has a U-Value of 0.35 W/m2K in comparison to the timber frame outer wall, which has a U-Value of 0.25 W/m2K. The findings for this particular calculation show that the timber frame domestic construction has a better U-Value than its masonry constructed counterpart. Building Energy Rating (BER) Calculation The author decided to compare the Building Energy Rating of both methods of construction. To achieve this the author availed of the expertise of a qualified BAR assessor who calculated both BER values using the same house plans as used for the U Value Calculations. For the purpose of the reader the author explains some of the terms associated in the Building energy rating procedure. Building Energy Rating Terms The procedure is based on calculating the energy balance for a dwelling, this is the energy required by the dwelling plus any losses, then less the energy gains this is equal to the energy delivered in to the dwelling (Cheveron Training 2009) Delivered Energy, expressed as kWh/year. This corresponds to the energy consumption that would normally appear on the energy bills of the dwelling for the assumed standardisation occupancy and end users considered. (Cheveron Training 2009) Primary Energy, expressed as kWh/year. This includes delivered energy, plus an allowance for energy overhead incurred in extracting, processing and transporting a fuel or other energy carrier to the dwelling. For example, in the case of electricity it takes account of generation efficiency at power stations. (Cheveron Training 2009) The results show that both timber frame and traditional masonry domestic construction have an energy rating of B2 for this house. The B2 rating is acceptable for a building, which incorporates a natural ventilation design. The primary energy value for the timber frame method of construction is lower than its masonry counterpart and indicates that the overhead incurred in extracting, processing and transporting of energy to the dwelling is lower for timber frame method. The comparison of the Co2 emissions results in the timber frame method having lower emissions output and as previously discussed the lower the Co2 emission the better it is for the environment. Finally the timber frame method had a lower delivered energy rating. This shows that the energy consumption on the energy bills of the dwelling are again lower than its masonry counterpart. Developers views regarding the change from masonry to timber frame: To achieve a true indication on the views of the construction industry in regard to both methods of construction and why the trend has moved towards timber frame it was necessary to obtain the views of developers who actually carry out the building works. As part of the author research, many construction agencies were contacted. Philip Mahoney of timber frame manufactures association was contacted and helped with the authors questions. Philip Mahoney of the Timber Frame Manufacturing Association said when asked why the trend has moved from masonry to timber frame. From a developers point of view speed of construction was very important, because a timber frame house can be up and roofed in a matter of days and ready for the follow on trades to move in. for the developer this was a great advantage as they were in and out much quicker and therefore turn cash over. Timber frame would have also have got popular with the self build sector because of the fact that a) quite an education process was carried out by the association and its members, b) the green card also began to come into play as well as timber frame is seen as environmentally friendly which the industry has been promoting. Tom McHugh, Director of Kilcloghans Ltd Galway who have been prominent traditional masonry builders for a number of years said in regards to ease of build we are masonry builders and we build timber frame, we find that it is especially simple to build the timber frame method he went on to say in relation to construction costs timber frame is as economical to build as traditional masonry regarding construction costs in relation to the downturn in the construction industry he stated yes the construction cost for both methods had dropped but both methods still work out in and around the same price. He also stated that they found the main advantages of timber frame to be a drier form of construction as well as the obvious advantages of speed to build and economical to run. From a selling point of view he found timber frame, easier for the reason that they are more economical in terms of energy use. Francis Geraghty Director of Frame to finish building contractors Co Galway stated in terms of ease of construction, the timber frame method depends largely on the type of house the client wants to build as well as the quality of site preparation before the timber frame building reaches the site. He sees the main advantages of the timber frame method for him are the U-Values that can be achieved and also the whole timber frame structure is up and ready for internal work in a matter of days. Colm Kilroy a Quantity S
Wednesday, November 13, 2019
PlayBall Essay -- Sports, Student Athetes
Issue: What degree of care will PlayBall owe participants, and how might PlayBall minimize liability for failing to reach that standard of care under Washington law? Brief Answer: The duty of care PlayBall will owe participants will depend on their status as student athletes, parents, volunteers, or spectators. It will be difficult for PlayBall to limit liability for negligence involving student athletes, who are minors. The liability to adult participants may be reduced if PlayBall obtains waivers releasing PlayBall from liability or if claimant assumes the risk. Statement of Facts: The client is a newly formed, non-profit corporation here in Washington. It is called PlayBall, Inc. It was established to provide high school students, who are either home-schooled or attend small private schools that do not have their own sports teams, with opportunities to play on teams and to compete in state-wide competitions with other high-school teams. It has not started operations yet. The business plan, at this point, is that PlayBall will recruit volunteer coaches and players for three sports -- football, baseball and soccer. The players must be between 13 and 18 years old and must not have access to these team sports at the school they attend, nor be eligible to join a team at another school. Players, or their families, will pay a modest fee to join a team. The fee is designed to offset PlayBallââ¬â¢s administrative costs in organizing teams, sponsoring league competitions, training coaches and providing equipment. PlayBall will not provide transportation. Parents will do that. PlayBall will not be using school property, but will have their games and practices in public parks and facilities. PlayBall will not be joining Washingto... ...ntiff is injured as a result of a risk inherent in the sport, the defendant has no duty and there is no negligence.â⬠Taylor v. Baseball Club of Seattle, 130 P. 3d 835, 838 (Wash. Ct. App. 2006). As long as the risk is reasonably foreseeable, PB should be able to avoid a duty of care to spectators. Conclusion PB should use a combination of techniques to manage risks including waivers that warn of potential risks, parental indemnity clauses, and proper training for volunteers to ensure they meet the standard of care and shift risk where possible. These are generally cost-free methods that can reduce litigation costs by waiving the rights of one party to another for negligence claims. However, because waivers cannot bar a minorââ¬â¢s claim, and there is always a chance of human error, it is crucial that PB purchase insurance to cover the costs of potential liability. PlayBall Essay -- Sports, Student Athetes Issue: What degree of care will PlayBall owe participants, and how might PlayBall minimize liability for failing to reach that standard of care under Washington law? Brief Answer: The duty of care PlayBall will owe participants will depend on their status as student athletes, parents, volunteers, or spectators. It will be difficult for PlayBall to limit liability for negligence involving student athletes, who are minors. The liability to adult participants may be reduced if PlayBall obtains waivers releasing PlayBall from liability or if claimant assumes the risk. Statement of Facts: The client is a newly formed, non-profit corporation here in Washington. It is called PlayBall, Inc. It was established to provide high school students, who are either home-schooled or attend small private schools that do not have their own sports teams, with opportunities to play on teams and to compete in state-wide competitions with other high-school teams. It has not started operations yet. The business plan, at this point, is that PlayBall will recruit volunteer coaches and players for three sports -- football, baseball and soccer. The players must be between 13 and 18 years old and must not have access to these team sports at the school they attend, nor be eligible to join a team at another school. Players, or their families, will pay a modest fee to join a team. The fee is designed to offset PlayBallââ¬â¢s administrative costs in organizing teams, sponsoring league competitions, training coaches and providing equipment. PlayBall will not provide transportation. Parents will do that. PlayBall will not be using school property, but will have their games and practices in public parks and facilities. PlayBall will not be joining Washingto... ...ntiff is injured as a result of a risk inherent in the sport, the defendant has no duty and there is no negligence.â⬠Taylor v. Baseball Club of Seattle, 130 P. 3d 835, 838 (Wash. Ct. App. 2006). As long as the risk is reasonably foreseeable, PB should be able to avoid a duty of care to spectators. Conclusion PB should use a combination of techniques to manage risks including waivers that warn of potential risks, parental indemnity clauses, and proper training for volunteers to ensure they meet the standard of care and shift risk where possible. These are generally cost-free methods that can reduce litigation costs by waiving the rights of one party to another for negligence claims. However, because waivers cannot bar a minorââ¬â¢s claim, and there is always a chance of human error, it is crucial that PB purchase insurance to cover the costs of potential liability.
Subscribe to:
Posts (Atom)